As your discharge area is unknown, you can call +90 552 876 55 30 to request an offer or information.
Package wastewater treatment systems are systems applied specifically for the treatment of domestic biological wastewater. The units are produced in our factory within 10-15 days of production time. They can respond to the desired needs by adding capacities.
900-PERSON PACKAGE WASTEWATER TREATMENT SYSTEM The equipment/materials are provided without spare parts.
Material :
ST37 Carbon Steel - Special Production
Sheet Thickness :
4 mm - Trapezoidal Fold - Special Production
Grate :
Basket Grate (500 mm X 500 mm X 500 mm) - Special Production
Rake Winch :
1 Unit - Manual Hoist Lifting - Special Production
Blower :
1 Unit (European Origin)
Feed/Transfer Pump :
1 Unit (European Origin)
Discharge Pump :
1 Unit (European Origin)
Chlorine Dose Pump :
1 Unit (Domestic or European Origin)
Chlorine Tank (PE) :
1 Unit (Akro) - Domestic Product
Automation :
Automation Panel - Logo Siemens PLC Automatic Control
Production Time / Average :
10 - 15 Days.
Transportation / Shipment :
Transportation, Customs, and Taxes Excluded. (EX-WORK)
TESLİMAT
Ürünü sipariş verdiğiniz gün saat 14:00 ve öncesi ise siparişiniz aynı gün kargoya verilir.
Eğer kargoyu saat 14:00`den sonra verdiyseniz ürününüzün stoklarda olması durumunda ertesi gün kargolama yapılmaktadır.
In order to provide you with the best shopping experience, we use cookies on our website watermall.com.tr. You can check out the Cookie and Privacy Agreements for detailed information.